A. Control Over Use: After the effective date of approval of this Development Guide and subject to the provisions of Section V (Non-Conforming Uses and Non-Conforming Buildings) of the 1982 Douglas County Zoning Resolution or amendment thereto.
1. Any new building or other structure, and any parcel of land, may be used; and
2. The use of any existing building, other structure of parcel of land may be changed or extended; and
3. Any existing building or other structure may be enlarged, reconstructed, structurally altered, converted or relocated; for any purpose permitted or required by the provisions of this Development Guide applicable to the area in which such building, other structure or parcel of land is located, and for no other purpose. Such use, change, extension, enlargement, reconstruction, structural alteration, conversion or relocation shall be subject to all other standards and requirements set forth or referred to in the standards and requirements for that area, and to any other applicable standards and requirements of this Development Guide.
B. Control Over Location and Bulk: After the effective date of this Development Guide and subject to the provisions of Section V (Non-Conforming Uses and Non-Conforming Buildings) of the 1982 Douglas County Zoning Resolution and amendment thereto, the location and bulk of all buildings and other structures, existing and future, shall be in conformity with:
1. All standards and requirements set forth or referred to in the standards and requirements for the area in which such buildings and other structures are located; and
2. Any other applicable standards and requirements of this Development Guide.
C. Incorporation of Development Plan: The plan of development for Castle Pines North including the location and the boundaries of Planning Areas, the uses, the circulation elements, and the densities established by this Development Guide, is shown upon the "CASTLE PINES NORTH DEVELOPMENT PLAN" (hereinafter sometimes referred to as "Development Plan" or "Master Plan"), which is hereby incorporated by reference into this Development Guide as Section XIII, together with everything shown thereon and all amendments thereto.
D. Approvals of Flats: In order to insure that Castle Pines North is developed under one single development responsibility, in accordance with Section 13.1.a of the Douglas County Zoning Resolution, all preliminary plats, final plats and amended plats shall be reviewed and approved by Castle Pines Land Company.
E. Issuance of Building Permits: No building permits for any construction, improvements or alterations at Castle Pines North shall be issued until the plans, specifications and details have been reviewed and approved by the Design Review Board as defined herein and a certificate of approval executed by an officer of the Design Review Board shall be affixed to the plans and specifications and made a part of each building permit application. All applicable projects shall be subject to site plan review by Douglas County in accordance with Section VII of the Douglas County Zoning Resolution.
F. Issuance of Certificate of Occupancy: No certificate of occupancy for any building at Castle Pines North shall be issued by Douglas County until a letter recommending such issuance is completed and forwarded to the County by the Design Review Board.